After dragging the cart full of wood more than half this section of trail, we were able to bridge over a mucky bog, a huge improvement. Growth was high with an increase in thistle and weeds over other years. A lot of signage was replaced, hose put over barb wire stile crossings, much clipping, mowing making a huge difference and the chain saw worked hard. We have a park like path in the woods, by a lake for all to enjoy!
Great effort by all volunteers!
At some point we will replace the stile at A35 and the bridge near there too.